Electrical rough in continues. The exterior light under the front shade is now completed.

Electrical rough in

The exterior light on the south side under the front shade is also completed.

Electrical rough in

The exterior light under the balcony is also completed. However, I forgot to factor in the 4.5″ difference between the edge of the balcony and the facade. So now the measurement is a bit off. I will have to have them corrected.

Electrical rough in

For the power receptacles, this one is right in front of the stair opening to the 2nd floor.

Electrical rough in

I have also asked the electrician to add two output next to the front window.

Electrical rough in

This one is on the other side of the window opening.

Electrical rough in

The receptacle on the 2nd floor ceiling is also completed. This one is on top of the entrance. We will have to use a chain to position the drop cord right over the skylight. I will be hanging a Noguchi Akari ceiling lamp at the entrance.

Electrical rough in

This one is over the living area and the position of this one is pretty good, just a bit off center to give me that offset for a second much larger Noguchi Akari ceiling lamp.